Cycle time and takt time
They are easy to confuse and they answer different questions. The cycle time belongs to the machine: the time from one finished part to the next, with every movement in it. The takt time belongs to the order book: how long one part may take if the demand is to be met in the time there is.
takt = production time per day / demand per day production time = shifts × (hours × 3600 − planned stops × 60)Two 8-hour shifts with 30 minutes of planned stops each leave 54 000 s. For 9000 parts a day that is a takt time of 6.0 s. A machine with a 4.5 s cycle is 25 % inside it; one with a 7 s cycle needs a second machine, or a shorter cycle.
A shorter cycle rarely comes from faster actuators. It comes from overlapping the movements that do not have to wait for each other — which is what a cyclogram shows and a list of times hides.
Availability: the cycle to design for
No machine runs every second of the shift. Refilling feeders, clearing a jam, a tool change: the share of the time it really runs is its availability, and it shortens the cycle you must design for.
cycle to design for = takt × parts per cycle × availabilityWith a 6.0 s takt and 85 % availability the machine must cycle in 5.1 s, not 6. Leaving this out is the usual reason a machine that met its cycle time on the test floor misses its output in production.
Air consumption of a cylinder
Compressed air is the most expensive energy on the machine, and the sum is short. Each stroke fills the cylinder with air at working pressure; expressed as free air, that is the swept volume times the compression ratio:
V = A × s × (p + 1.013) / 1.013 A_out = π · d² / 4 A_back = π · (d² − d_rod²) / 4A Ø32 mm cylinder with a 12 mm rod and a 100 mm stroke at 6 bar uses 0.56 l out and 0.48 l back — about one litre per double stroke. At 20 cycles a minute that is 21 l/min and roughly 10 m³ in an 8-hour shift. The tubing between valve and cylinder adds its own volume on every stroke; the pneumatic cylinder calculator counts it, and works out the stroke time too.
From the numbers to the machine
These sums tell you the cycle time the machine has to reach. Whether its movements fit into that time is a drawing: one lane per actuator, one bar per movement, the dependencies between them. That drawing is a cyclogram — what it is and how to read one, or bring the one you keep in Excel.
Questions
What is the difference between cycle time and takt time?
Cycle time is what the machine does: the time from one finished part to the next. Takt time is what the customer needs: the production time available divided by the parts demanded. The machine fits when its cycle time, with stops counted in, is no longer than the takt time.
How do I calculate parts per hour from cycle time?
Divide 3600 by the cycle time in seconds and multiply by the parts made per cycle. A 3 s cycle gives 1200 parts an hour; at 85 % availability, 1020.
How is takt time calculated?
Take the production time per day — shifts times hours, less the planned stops — and divide it by the daily demand. Two 8-hour shifts with 30 minutes of stops each leave 54 000 s; for 9000 parts a day the takt time is 6 s.
What availability should I assume?
For a new automatic assembly machine 85 % is a common planning figure; a simple, well-proven station runs higher and a line of many linked stations lower. Use the figure your customer's specification names if it has one.
How much air does a pneumatic cylinder use?
For each stroke, the piston area times the stroke times the compression ratio (p + 1.013) / 1.013, with p the gauge pressure in bar. A Ø32 mm cylinder with a 100 mm stroke at 6 bar uses about one litre of free air per double stroke.
What if the cycle time is longer than the takt time?
Either shorten the cycle — overlap movements that do not have to wait for each other — or split the work over more machines or parallel stations. The calculator shows how many machines of that cycle time the demand needs.
More free tools
- Excel timing chart to cyclogramDrop the machine timing chart you keep in Excel and see it as a cyclogram in a minute. Read in your browser, never uploaded. Free, no account.
- Axis and motor sizing calculatorSize a machine axis in six steps: the motion, a ball screw, belt, rack, rotary table or cylinder, a servo, stepper, BLDC or AC motor. Every formula shown.